News

How To Maintain High-efficiency Spiral Drill Pipe

Update:08-04-2021
Abstract:  1. The use of high-efficiency auger rods should be within the rated drilling distance of the drilling rig. According t...

  1. The use of high-efficiency auger rods should be within the rated drilling distance of the drilling rig. According to the technical parameters of the drilling distance and the drilling rig model, a matching drill rod should be selected.

  2. When the high-efficiency spiral drill pipe is used in conjunction with the drill bit, the drill bit should be larger than the diameter of the drill pipe under normal circumstances, and the condition of the drill rig and the drill pipe should always be paid attention to during the drilling process. In the event of the stuck drill, lock, etc., stop drilling immediately or drill back slowly to ensure that the drill pipe does not bend or deform.

  3. When the high-efficiency spiral drill pipe is ventilated or watered, the drill pipe should be determined to be tightly connected when drilling. When the drill pipe has sealed, such as O-rings, pay attention to the use of the seals. In the event of damage, corrosion, etc., the seals should be replaced in time. After the drilling is completed, the seals are maintained and cleaned.

  4. The high-efficiency spiral drill pipe should be manually connected correctly when drilling to ensure a tight fit. It is not possible to drill directly on the drill rig to prevent damage to the drill pipe. It should be ensured that the drilling depth of the high-efficiency spiral drill pipe meets the relevant requirements of geological drilling to prevent the drill pipe from falling off due to the drilling depth reaching the use limit of the drill pipe.

  5. If the curvature of the high-efficiency auger rod exceeds the standard requirements or the thread is damaged, it should be scrapped or returned to the factory for repair in time.

  6. When working in acid-alkali areas, pay attention to the corrosive effect on drill pipes. When drilling is completed, clean the rod surface with clean water in time to remove the corrosion layer.

  7. High-efficiency spiral drill pipes should be maintained regularly. The maintenance period should be determined according to the use environment and air humidity, and rust-proof oiling and dust-proof treatment should be carried out regularly. After maintenance and rust removal/dust cleaning, the protective cap should be buckled or packed and sealed to ensure that the drill pipe is frequently used and new.